Driving Through Time - The Digital Blue Ridge Parkway
Search Results:
-
Installing slope underdrain
May 1943
-
Flume emptying into inlet, at junction of Parkway and Route 609 [610]
July 15, 1943
-
Wood flume and box to take surface water from shoulder berms
July 15, 1943
-
Flume inlet detail
July 15, 1943
-
Load Lugger rigged for watering
August 10, 1943
-
Load Lugger rigged for watering
August 10, 1943
-
Rockfish Gap
November 16, 1943
-
Parkway Skyline Drive access and signs
August 3, 1944
-
Swannanoa Development
September 1944
-
Swannanoa Development
September 1944
Items in Query
Results: 16
Refine Your Search
Types (1)
Photographs (16)Locations (6)
Rockfish Gap (8) Rockfish Gap Overpass (2) Section 1B (2) Swannanoa Gate (2) Humpback Rocks Visitor Center and Mountain Farm (1) Milepost 4 (1)Sections (1)
1B (16)Counties (2)
Augusta (13) Nelson (3)