Driving Through Time - The Digital Blue Ridge Parkway
See Larger Image
About this Item
Title | Bridge under construction Project 1-N-11 |
Date | May 1959 |
Description | The image shows the construction of a circular bridge on a steep hillside surrounded by trees. A concrete support arch has been built, and a crane is beside the arch. A dirt road runs above the bridge construction, on which several vehicles are parked. The photograph was taken during May of 1959 at milepost 128.8 over Route 690 and Metz Run Creek in section 1N of the Blue Ridge Parkway. The photographer was Jack Boucher. |
Location |
Location Name: Milepost 128 Parkway Milepost: 128.0
Latitude: 37.182877
Longitude: -80.052182 |
Creator Individual | Jack E. Boucher |
Tags |
Bridge construction
Construction Construction equipment Photographs Roanoke County (Va.) |
Credit | Courtesy National Park Service, Blue Ridge Parkway |