Driving Through Time - The Digital Blue Ridge Parkway
Search Results:
-
Before grading. Detail showing depth of gullies in erosive soil. Rock decomposed into sand.
July 25, 1935
-
Before grading. Washout ditch filled; needs transition, rounding, and drainage structure.
July 25, 1935
-
Before grading. Soft gullying material above rock. Flatten expose hard rock. Wide rounding.
July 25, 1935
-
First Grading Contract
September 1935
-
First Grading Contract
September 1935
-
First Grading Contract
September 1935
-
First Gradeing Contract
September 1935
-
Roaring Gap Detail of stone entrance gate post
September 17, 1935
-
New New River Bridge, Detail of Chimney of Old House
September 17, 1935
-
Stone work of Graystone Inn
September 18, 1935
Items in Query
Results: 30
Refine Your Search
Types (2)
Photographs (29) Maps (1)Locations (10)
Milepost 221 (6) Milepost 226 (5) Milepost 218 (4) Section 2A (4) Milepost 227 (3) Milepost 217 (2) Milepost 228 (2) Milepost 229 (2) Cumberland Knob (1) Devil's Garden (1)Sections (1)
2A (30)Counties (1)
Alleghany (30)