Driving Through Time - The Digital Blue Ridge Parkway
Search Results:
-
Gully control (after)
July 26, 1941
-
Severe sheet and some gully erosion (before)
August 1941
-
Gully and sheet erosion (work started)
November 1941
-
Gully and sheet erosion (mulching with pine)
November 1941
-
Shows active gully and sheet erosion (before)
November 1941
-
Gully control (after) Beng, N.C.
November 1941
-
Gully erosion
May 1942
-
Gully and Sheet Erosion
July 1, 1942
-
Gully and sheet erosion, large pasture with active sheet erosion.
September 1942
-
Gully and sheet erosion
August 1944
Items in Query
Results: 21
Refine Your Search
Types (1)
Photographs (21)Locations (11)
Milepost 268 (8) Milepost 226 (2) Section 2A (2) Section 2E (2) Cumberland Knob (1) Daniels Gap (1) Milepost 170 (1) Milepost 229 (1) Milepost 261 (1) Milepost 265 (1) Milepost 267 (1)Sections (4)
2E (13) 2A (6) 1S (1) 2D (1)Counties (4)
Ashe (12) Alleghany (6) Wilkes (2) Floyd (1)