Driving Through Time - The Digital Blue Ridge Parkway
Search Results:
-
Wood flume and box to take surface water from shoulder berms
July 15, 1943
-
Slope for Experiments 1 and 3 during scaling operations
July 23, 1943
-
Slope for experiments 2 and 4 before work was done
July 23, 1943
-
Experiment 2 after holes were silled with sawdust and earth. Note earth being lost on slope from rounding
July 26, 1943
-
Holes for root planting, lower portion of cut to be seeded
July 27, 1943
-
Experiment 1 after scaling and partial trenching
July 28, 1943
-
Experiment 3 slope after scaling and rounding, lime being applied
July 28, 1943
-
Experiment 3 completed
July 30, 1943
-
Experiment 1 with mulch placed between trenches
July 31, 1943
-
Experiment 1 top half completed, lower half with incorporated mulch in place.
July 31, 1943
Items in Query
Results: 49
Refine Your Search
Types (2)
Photographs (48) Newspaper Articles (1)Locations (24)
Section 1C (8) Milepost 7 (4) Rockfish Gap (4) Section 2C (4) Milepost 334 (3) Milepost 157 (2) Milepost 158 (2) Milepost 337 (2) Section 1B (2) Section 2A (2) Twin Tunnel #1 (2) Little Switzerland (1) Milepost 201 (1) Milepost 202 (1) Milepost 220 (1) Milepost 242 (1) Milepost 245 (1) Milepost 333 (1) Milepost 4 (1) Milepost 417 (1) Milepost 6 (1) Section 2L (1) Section 2M (1) Twin Tunnel #2 (1)Sections (9)
1C (13) 2L (8) 1B (7) 2C (6) 1R (4) 2M (4) 2A (3) 1V (2) 2U (1)Counties (10)
Augusta (19) McDowell (9) Alleghany (8) Floyd (4) Carroll (2) Mitchell (2) Nelson (1) Transylvania (1) Wilkes (1) Yancey (1)