Before grading. Washout ditch filled; needs transition, rounding, and drainage structure.
July 25, 1935
-
Before grading. Soft gullying material above rock. Flatten expose hard rock. Wide rounding.
July 25, 1935
-
Before grading. Showing objectionable effect of uniform slopes and insufficient rounding
July 25, 1935
-
First Grading Contract
September 1935
-
First Gradeing Contract
September 1935
-
First Grading Contract
September 1935
-
Cut Ditch and Bank
October 28, 1936
-
Devil's Garden Parking and Overlook after Grading
April 21, 1938
-
Unpaved roadway with erosion
July 25, 1938
-
Before grading. Cave-in on 1:1 slope. Will continue to slide unless flattened. Needs rounding.
July 25, 1938
Items in Query
Results: 14
Refine Your Search
Types (1)
Photographs (14)Locations (8)
Milepost 218 (3) Milepost 224 (2) Milepost 227 (2) Milepost 229 (2) Section 2A (2) Devil's Garden (1) Milepost 219 (1) Milepost 226 (1)Sections (1)
2A (14)Counties (1)
Alleghany (14)